Cpc Construction Pte. Ltd.

-

Ongoing Projects

  • Construction of Civil Engineering Works at Bukit Merah Redevelopment HDB Contract 40
  • Construction of Road Linking Kim Tian Road and Moh Guan Terrace
  • Widening of Bedok Reservoir Crescent
  • Part A:Reconstruction of Roadside Drain At Pasir Ris Dr8/ Tpe and Construction of Outlet Drain At Tpe/Pasir Ris St 51.
F83E266A 2B60 4E66 AFF9 D35661D7E28C